As part of a Corporate underground storage tank removal effort, Reliance was called upon to supervise closure activities across the eastern Pennsylvania Region. Subsurface petroleum impact was discovered in 50% of the fuels systems closed.
process
Managed the closure via removal of a large-scale petroleum fueling system at a quarry.
Severe petroleum impact was discovered affecting both soils and groundwater.
Reliance supervised all operations and activities to minimize cost while addressing regulatory requirements and keeping operations at the quarry going.
Separate phased liquids (diesel fuel) were successfully removed from the aquifer without the costly installation of on-site remediation equipment.
Closure was secured quickly and effectively in accordance with the client’s priorities.
results
Regulatory closure and liability relief was successfully secured within 6-months.
Contamination was cost effectively addressed while obtaining the clients desired outcome.